Project
Bahrain
Bier-Bauconsulting: Owners engineer on site (on behalf of Fichtner GmbH & Co. KG, Stuttgart)
Nominal power solar plant: 3 MW
Nominal power of wind turbines: 2 x 1 MW
Technology: Solar – Modules on stand technology, rammed
Wind turbines – VESTAS
Execution time: 2017 / 2018
Project photos
Projekt information
The Kingdom of Bahrain, represented by the Energy and Water Authority (EWA), built a Combined Solar-Wind Turbine as a pilot project for renewable energies on the east coast of Bahrain after a long period of preliminary planning.
As several engineers and employees of the authority are to be located on site, an administration building was also built.
The scope of Bier-Bauconsulting’s assignment included
- the monitoring of the work of the contractor Juwi or its subcontractors
- monitoring the schedule during all phases of the project
- regular meetings with client and contractor
- regular reporting to the client