Project
Zonnepark De Watering, Coevorden, The Netherlands
Bier-Bauconsulting: Project Management
Nominal power: 12 MWp
Technology: Fixed installation with low maintenance requirements (pile driving)
Execution time: 2019
Bier-Bauconsulting: Project Management
Nominal power: 12 MWp
Technology: Fixed installation with low maintenance requirements (pile driving)
Execution time: 2019