Open space solar plant in Kalanti, Finland
Nominal power: 200 MWp // Technology: Fixed installation with low maintenance requirements (pre-drilling, backfilling, ramming) // 1 Transformator station // Execution time: 2023 – 2025
We drive to the desert and check if it is feasible.
We lead your management team with a regular presence on the construction site – because only there the problems are visible.
We support you in finding a solution, as our wide range of information and experience enables us to take a broad approach.