Project
Open space solar plant with transformatorstation in Zamosc, Poland
Bier-Bauconsulting: Project Management
7 sub-projects with a nominal power of approx. 140 MWp
Technology: Fixed installation with low maintenance requirements (pile driving)
4 transformatorstations (to 10 KV for transfer to the public grid)
Execution time: 2022